Bega Skim Milk Rehydration Plant

Delivered Fast: Complete Turnkey Solution with Zero Compromise on Quality

Industry

Duration

Location

Completion

The Challenge

Bega, a leading Australian dairy and food manufacturer, needed a fully functional skim milk powder rehydration plant—fast. With commercial supply commitments locked in across Far North Queensland, the facility had to be designed, built, and commissioned within a strict four-month window.

Initially engaged for the electrical design, we were awarded the full project scope just 12 days later—including electrical, mechanical, and instrumentation design and installation. From that point, every day counted.

Upon reviewing the initial brief, it became clear that the original estimate of 300 m of piping was significantly underestimated. The actual requirement was closer to 900 m. Despite this scope increase and the tight deadline, the plant still needed to be delivered on time, fully automated, and seamlessly integrated into Bega’s existing SCADA system.

The Solution

We mobilised our team to site within two weeks. After conducting a full walkthrough of the factory, we identified critical cut-in points and developed a detailed mechanical layout optimised for hygienic operation and flow efficiency.

Our team handled the complete electrical and instrumentation design, delivering a fully automated system that met Bega’s operational and integration needs. We adapted quickly to scope changes, scaling up the piping design and installation without impacting the overall timeline.

Throughout the four-month build, we managed all procurement, site works, electrical fit-out, SCADA integration, and commissioning.

  • Full project delivered in just 4 months
  • Piping expanded from 300 m to 900 m without timeline delay
  • 8,280 LTI-free hours, demonstrating a strong safety culture
  • Seamless integration into Bega’s SCADA system
  • Commissioned on time to meet critical delivery contracts

The Results

Bega was highly impressed with our responsiveness, engineering quality, and ability to adapt to scope changes without sacrificing schedule or performance. The project significantly enhanced Bega’s production capacity and operational efficiency.

This project highlights our proven expertise in delivering complete processing plant solutions—from concept to commissioning. With deep capability in sanitary pipe purge welding, automated process design, and integrated control systems, we specialise in building high-performance, hygienic systems tailored to the food and beverage sector. Our ability to react to changing scopes, maintain precision, and deliver under pressure makes us the go-to partner for complex, time-critical plant builds.

Other Projects

Bega Dairy & Drinks

Flexicon Skim Milk Powder Hazardous Area Install

Silica Resources Australia

Powering Progress: How Silica Resources Australia Launched Their High-Grade Silica Plant with Our End-to-End Services

"Lorem ipsum dolor sit amet, consectetur adipiscing elit. Suspendisse varius enim in eros elementum tristique. Duis cursus, mi quis viverra ornare, eros dolor interdum nulla, ut commodo diam libero vitae erat."

Name Surname
Position, Company name

Ready to chat about your next project?

Ready to get started?